Automatic Riveting Machine Ordering Process: 8 Steps

Published: 2026-02-03 09:22:27   Views: 574    Author: Antec
 

 

Automatic Riveting Machine Ordering Process: 8 Steps

First-time buyers of an automatic riveting machine rarely know what to prepare before the first call or how long each stage takes. This guide breaks the Antec standard ordering process into eight steps and spells out what the customer must do at each one, so the project can be scheduled with confidence.

Antec builds the three riveting lines separately, so general riveting, rivet nut fastening and blind rivet assembly each get equipment matched to the condition. The notes below look at automatic riveting machine work in that setting.

In short, for manufacturing plants that rivet across several product types: the eight-step ordering process; key points at each step; installation, commissioning and training; handling common delivery issues after arrival.

1. The Eight-Step Ordering Process

StepWhat HappensCustomer Action
1 Inquiry and specificationsContact us by phone or web form with rivet and workpiece detailsSend rivet specs, drawings and output requirements
2 Proposal and quotationProposal and price range in about 10 minutes, plus a standard or custom recommendationApprove the configuration direction
3 On-site trialAn engineer brings a matched machine to your plant and runs your real workpiecesPrepare rivets, workpieces and cycle-time targets
4 Contract and customizationModel, price, lead time and warranty confirmed, contract signedApprove the quotation and contract terms
5 Design and productionCustom tooling design, procurement, assembly and in-house trial runsSend rivet samples promptly
6 ShippingStandard machines ship fast from stock; custom units ship against agreed milestonesConfirm the delivery address and unloading conditions
7 Installation, commissioning and trainingOn-site installation, commissioning, and hands-on training in operation and maintenanceAssign operators and maintenance staff
8 After-sales and warranty1-year machine warranty, long-term parts supply and global service responseRun routine maintenance against the checklist

Selection data from thousands of stations is what makes the first recommendation reliable.

2. Key Points at Each Step

Inquiry and proposal. Sending everything at once saves the most time: rivet head diameter, body diameter, length and material; workpiece drawings or photos, material thickness and hole count; daily output and cycle-time targets; and the air supply and floor space available on site. With complete information we return a proposal and price range in about 10 minutes, and complex custom projects usually get a preliminary proposal within 1 business day.

On-site trial. For customers worldwide, the factory arranges for an engineer to bring a matched machine to the plant and test continuous feeding, cycle time, pull force and yield on your own rivets and workpieces. A standard on-site trial is free and does not commit you to a purchase.

Production and acceptance. Standard models ship quickly from stock. Custom units are assembled and then run continuously in-house with the customer's rivet samples; you can inspect at the factory or review the sample-run video and measured data, and the machine ships once you sign off. Lead time follows the contract, so raise urgent orders early.

Automatic Riveting Machine installation, commissioning and on-site training
Photo: a fixed-station model being installed and commissioned on site after delivery, with operator training

3. Installation, Commissioning and Training

ScopeWhat It Covers
Set-up on siteMain unit positioned, air and electrical lines connected, feed tube and gun installed
Parameter tuningFeeding, pull force and cycle time dialed in to the rivet spec and confirmed with a continuous sample run
Operator trainingPower-up, rivet changeover, refilling, counting and handling common alarms
Maintenance trainingDaily, weekly and monthly inspections, plus wear-part identification and replacement

Every machine carries a 1-year warranty, with a 7-day return and 15-day exchange policy for non-human-caused problems, and wear parts such as nosepieces are supplied long-term at cost; the factory handles after-sales response worldwide. For custom lead times, see how long it takes to build a custom automatic riveting machine.

Standard models cover most jobs, and the exceptions are where the engineering team earns its keep.

9. Handling Common Delivery Issues After Arrival

IssueHow It Is Handled
Cosmetic damage or missing parts on arrivalPhotograph it on the spot and contact your sales rep; shipping claims and replacement parts are issued per procedure
Insufficient air pressure on siteSet up the air compressor as the manual specifies; our engineer checks the air supply parameters at installation
Rough feeding after a rivet changeoverCheck that the nosepiece and feed track match the new rivet, then clear the track and swap the nosepiece as trained
Cycle time short of expectationsConfirm the workpieces match the trial samples; an engineer comes back on site to re-tune and retest
Operator turnoverRequest refresher training or remote guidance; the machine has a low learning curve and is easy to run

We recommend naming one machine owner inside your plant to keep the manual, the wear-parts list and the inspection checklist, and to act as the fixed point of contact with the factory. Delivery, training and after-sales all connect more smoothly that way.

Repeat orders are simpler. The rivet specs, configuration and acceptance records for your existing machines are already on file, so an identical unit can go straight to stock confirmation and shipping. When you add a new rivet size or a new product line, you only send the new rivet and workpiece data and we extend the original proposal; the equipment history also keeps maintenance, spare parts and training consistent.

Ordering FAQ

Common Questions

Q1: Can we run a trial before deciding which model to buy?

Yes, and that is the standard path. Run the on-site trial first and use the measured data to confirm the model and configuration, so you do not buy the wrong machine.

Q2: What are the payment terms?

Payment is normally staged at the milestones agreed in the contract. Invoice type, tax and freight are all stated in the quotation and the contract.

Q3: What if operators still struggle after training?

Training is only signed off when the operator can run the machine independently. After that we can guide you remotely or return on site; the machine has a low learning curve, so a new operator is productive after a short session.

Q4: Can we add custom modifications after delivery?

Yes. New products or new rivet sizes can usually be handled on the existing machine by changing the nosepiece, adding a feed track or fitting a fixture table. Larger changes are re-engineered by our team, and existing customers save on investment by reusing the current main unit.

Automatic Riveting Machine at a glance: 12,800 N pull force, 80 cycles per minute, in stock for fast delivery, response within 5 minutes.

Antec has served more than 1,300 manufacturing enterprises with selection, non-standard customization, free on-site trials and after-sales training.

Which of the three lines fits this job?

Send the rivet specification and the workpiece drawing. Antec engineers will name the line, the model and the price band, then arrange a free on-site trial.

Further reading: what to prepare for a custom automatic riveting machine · free on-site trial policy and process · free on-site trial: process and preparation

 

Free On-Site Trial / Sample Testing

+86 13556668682 Book On-Site Trial
Book On-Site Trial / Custom Solution
Engineers bring equipment on-site · Test with your workpieces

Standard on-site trials are free; we will contact you within 1 business day.